Gold Member Since 2017
Audited Supplier
Tianjin Belt Metal Products Co., Ltd.

Screw Pile Bracket, Large Ground, Screw Pile manufacturer / supplier in China, offering Large Ground Screw Pile Bracket, Hot Rolled Carbon Steel Channel Bar, Solar Powered Support/Panel Pressing Block and so on.

(/ )

Supplier Homepage Product Solar Energy System Large Ground Screw Pile Bracket

Large Ground Screw Pile Bracket

FOB Price: US $0.4 / Watt
Min. Order: 500 Watt
Min. Order FOB Price
500 Watt US $0.4/ Watt
Get Latest Price
Port: Tianjin, China
Transport Package: Standard Packing
Payment Terms: L/C, T/T, Western Union

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: A complete range of specifications
  • Application: Home, Industrial, Commercial
  • Trademark: CBD
  • Certification: ISO, CE
  • Specification: Normal, normal
  • Origin: Tianjin China
Product Description
Company Profile

Tianjin Coldbend Imp. & Exp. Co., Ltd. was established in 2011, is a set of solar bracket development, manufacturing and sales of production-oriented enterprises. The company independent research and development production of solar mounting systems ground mounting system, roof mounting system , matrix stents and other products to meet different latitudes range of different terrain, different roof mounting system requirements.

Product Description
InstallationThe ground
Installation angle5-60°
Wind load40m/s
Snow load1.6KN/m²
PV modulesFramed or unframed
Panels arrangementThe vertical or horizontal
StandardAS/NZS1170
DIN 1055
JIS C 8956;2011
International Building Code IBC 2009
California Building Code CBC 2010
MaterialQ235B(hot dip galvanized)
Fasteners partsSUS304
Small componentsHot galvanized , Alluminum alloy
ColorNatural white or color according to customer's requirement
Warranty10 years

1. the application of the hot galvanized process made by spiral pile has better corrosion resistance, longer service life.
2. the unique structure design to ensure to product itself is a powerful and pulling force.
3. there are different from the traditional method for foundation construstion of ecment, but uses the large pile driving machine, the average root pile construction time is about 2 mins, realize the high effiency operation, saving installtion time and labour costs.
4. compared with the cement base, screw pile construction process does not produce waste soil, and aluminum alloy metrial and carbon steel can be used recycling. And to protect the enviornment and economy is applicable.
Send your message to this supplier
Avatar
Mr. Runpeng Liu
General Manager
*From:
To: Mr. Runpeng Liu
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now